3D model showing metal rails and support components with measurements in centimeters and degrees, arranged on a flat surface.
Close-up of a wooden deck installation showing a yellow spacer, metal bracket, and track system for the flooring.
3D diagram showing two blue sliding rails mounted on black rectangular blocks with measurements, positioned on a grey and beige background.
Close-up view of a wooden deck with green, purple, and gray trim pieces and a screw.
Technical drawing of metal rail installation with measurements indicating 3 cm and 5 cm spacing, including screws securing the rails to black blocks.
Cross-sectional illustration of a track joint with metal, plastic, and wooden components.

Etapa 1: MONTAJUL SINELOR CU CANAL PENTRU DECKUL CLASIC

 

            

Pe terenul destinat amplasarii terasei se realizeaza o fundaţie din dale de beton (vezi img.1) sau se construieste o platformă betonată (vezi img.2). Panta recomandată, pentru fundatie, este de minimum 1% si  maximum 2% inclinare in sensul de scurgere al apei. Construcţia inferioară (scheletul de montaj) se realizează astfel: se aşează şina de montaj pe fundatie conform şi se fixează cu holşuruburi la mijlocul dalelor. Distanţa dintre profilele de montaj este de 35-45 cm. Pentru terasele care sunt proiectate pentru trafic intens recomandăm ca distanţa dintre profile să fie de 30-35 cm.

A digital illustration of a brown plastic section of railway track, including the sleeper, fastened to a blue metal rail with a gray base and yellow fastener component.
3D rendering of a construction plan showing a wooden walkway, metal beams, and support structures with measurement annotations.
A digital illustration of wooden flooring with two measurements marked at 0.5 cm each, showing the gap spacing between planks, with some electrical wiring visible beneath the floor.

Etapa 2: MONTAJUL DECKULUI CLASIC

          

Primele cleme ce se fixează cu holşuruburi pentru ca structura să nu alunece. Se introduce pe şina de montaj primul profil WPC, păstrându-se un rost de 3 cm faţă de perete (vezi img.4). Se introduc următoarele cleme care se recomandă să nu mai fie fixate, permiţând astfel dilatarea profilelor în diferite regimuri termice cât şi o eventuală demontare. Urmeaza urmatorul profil fixat din nou cu cleme …s.a.m.d. Distanta dintre capetele scandurilor este de 0,5cm.

Pentru a ascunde rostul de dilatare aparut ca urmare a montajului scandurilor “cap la cap”, se foloseste un profil de aluminiu ( vezi img. 7). Urmatorul pas este inchiderea terasei ce se realizeaza folosindu-se cele doua tipuri de plinta ( plinta “F” si “L” ).Plinta “L” se va monta longitudinal pe langa perete si are rolul de a acoperi spatiul liber dintre acesta si prima scandura. Plinta “F” are rolul de a inchide montajul deck-lui prin amplasarea ei pe marginea exterioara a deck-lui ( la ultima scandura ) , acoperind sistemul dandu-i astfel aspectul de finisat ( vezi img. 9).Ambele tipuri de plinta se pot fixa atat cu holsuruburi cat si prin lipire cu adeziv.